FUTERA FUSION XLF Series INFINITE ENERGY2 Series FUTERA XLF Series FUTERA FUSION Series FUTERA III Series FUTERA II Series DOMINATOR Series LCD DOMINATOR Series 8800 Series 8900 Series SPECTRUM Series HeatNet Controls Pool Heaters Storage Tanks Combustion Air System
Case Histories Upcoming Events News
 




RSS News Feed for RBI Water Heaters RBI Water Heaters News

11/7/2012    CIPHEX West

Come visit us at CIPHEX WEST in Vancouver, BC, Canada

Vancouver Convention Centre

Booth #941

November 7-8, 2012 

 

10/29/2012    ASPE

Come Visit us at ASPE 2012 in Charlotte, North Carolina.

Booth #2045

Charlotte Convention Center

October 29-30, 2012

10/16/2012    Boiler Group Newsletter October 2012

 

 
A Mestek Newsletter
October 2012
boiler group header
 
Greetings!
The temperature is dropping and heating season is upon us. With the expansion of Hydrotherm's KN product line and RBI's new Futera Fusion XLF, we've got some great new products.  Talented new leadership on the engineering side of the business is bringing increased momentum to our R & D efforts.  Let's get busy and make this a super successful fourth quarter!
 
Sincerely,
 
Distributor Products Group
Marketing Team
 

 

6/18/2012    Expanded Technical Service Classes Now Available

 

Technical Service Classes  

Now Available 

 

We are pleased to announce that we have expanded the 2012 Technical Service Seminar schedule to include three additional classes.   

 

As many of you know, our first six classes scheduled for 2012 were completely booked with days of being announced.  Class size is limited and is available on a first come, first served basis. These classes fill up fast so please do not delay registering!    

 

The following classes have been added to our 2012 Technical Service Seminar schedule:

  

July 31  

August 24

September 6

 

 

To register, visit us online at www.MestekInstitute.com.  For more information, contact Janine Pedro at             (413) 564-5779      

 

Please Click For Complete News Release 

 

 

6/12/2012    Condensing in Cast Iron is Recognized in 2012 ASHRAE HVAC Systems and Equipment Handbook

 

Exciting News!

Condensing in Cast Iron is Recognized

in 2012 ASHRAE HVAC Systems and Equipment Handbook

 

The 2012 edition of the ASHRAE HVAC Systems and Equipment Handbook is out. The chapter on condensing boilers we were waiting for is officially out. It reads as follows:

Please Click For Complete News Release 

6/12/2012    RBI Introduces the Fusion XLF

Fusion_XLF__Announcement.pdf

 

RBI Introduces their latest innovative high efficiency hydronic heating offering, the Fusion XLF.The new XLF brings you premium efficiencies of up to 99% with capacities of up to 4000 MBH- all in one compact footprint. 

Please Click For Complete News Release 

2/6/2012    CMX CIPHEX

 

Come visit us at CMX – CIPHEX 2012

Metro Toronto Convention Centre

Toronto, Ontario

Booth #2530 & 2532

3/22 – 10:00am-6:00pm

3/23 – 10:00am-6:00pm

3/24 – 10:00am-3:00pm

1/23/2012    AHR EXPO

Come visit us as the AHR International Air Conditioning Heating & Refrigeration Expo

Chicago - McCormick Place

Booth 4269 - 4569

January 23 - 25, 2012

 

10/4/2011    Greenbuild

Come see us at Greenbuild 2011, in Toronto Canada!

Metro Toronto Convention Centre: Toronto, Canada

Booth # 341n

3/31/2011    Mestek Boilers at ASHRAE 2011

George Carney introduces Ken Cohen and Sabino Piccirilli to discuss the KN-30 condensing boiler and HeatNet controls at the 2011 ASHRAE show in Las Vegas, Nevada

10/30/2010    ASPE Convention & Engineered Plumbing Exposition

7/8/2010    HeatNet control

HeatNet.pdf

HeatNet, RBI’s proprietary integrated boiler management system is the driving force behind RBI’s energy optimization philosophy for its high efficiency equipment and is standard equipment on all Fusion and Futera (XLF & III) Air-Fuel coupled products.  Designed for precise system control, Heat Net provides repeatability and feedback thru digital communication.  The control monitors boiler temperatures and limit circuit inputs, maintains system and domestic hot water requirements, supports boiler room components including system/domestic pump, boiler pump, combustion air damper and modulates boiler firing rate to maximize turndown ratios in order to maintain peak efficiency.   (Click on pdf for additional information)

5/31/2010    RBI Facility Recognized For ISO 9001:2008 Certification

Certificate-En-_13348.pdf

RBI Facility Recognized
 
Congratulations to RBI Management and employees of our RBI manufacturing facility for their recent ISO 9001-2008 certification.  ISO is an international organization that provides standards for quality in business. The ISO 9001:2008 standard provides a tried and tested framework for taking a systematic approach to managing the organization's processes so that it consistently turns out product that satisfies customers' expectations.  We are proud of our employees for going the extra mile and recognizing the importance of satisfied customers!

3/24/2009    Come visit the Mestek Boiler Group at the Go Green Expo April 17-19, 2009 New York City Hilton

Stop by and visit the Mestek Boiler Group in booth #210 at the Go Green Expo in the New York City Hilton.  For more information and hours please visit www.gogreenexpo.com

3/12/2008    New Futera Fusion Boilers Are IBR Rated And Up To 97.5% Efficient

WESTFIELD, Mass. October 30, 2006 -- RBI has introduced the next generation of high efficiency commercial boilers and hot water heaters with the Futera Fusion™, a boiler that is IBR-listed and up to 97.5% efficient. The new boiler is designed to meet the changing demands of environmentally sensitive or green building design.
The gas fired condensing boiler with full modulation and a 3:1 turndown, is available in sizes from 500 to 2000 MBH. The Futera Fusion features advanced heat exchanger technology with solid bronze headers, a gasket-less heat exchanger and finned copper or cupronickel tubing for superb heat transfer. A metal-fiber burner allows seamless modulating turndown, ultra-low emission levels and whisper-quiet operation. In addition, the system automatically adjusts energy input to precisely match the heating load without over-firing or wasting fuel. In addition every model has a minimum full input efficiency rating of 94.5% with certain sizes achieving a rating of 97.5%. At minimum inputs, each model is capable of producing efficiencies as high as 99%.
A secondary solid stainless steel heat exchanger with condensate trap operates at the boiler’s full-flow rate and allows operation in condensing mode at all times. A state-of-the-art temperature mixing system protects the system’s primary heat exchanger.
The Futera Fusion is available as a fully packaged unit, including integral boiler pump, near boiler piping, low temperature mixing value and secondary heat exchanger. In addition, the new boiler comes with a full, 21 year, non-prorated warranty against damage from thermal shock. Its compact footprint of just 29-inches wide enables the unit to fit though standard doors, and its low maintenance design makes the boiler ideal for commercial, institutional and industrial applications.
For additional information visit RBIWaterHeaters.com or call Tim Markel, national sales manager at (413) 568-9571.

Archived Articles
Mestek: Experience based innovation
Bookmark and Share
A Mestek Company       Copyright © 2004-2009 Mestek Technology, All Rights Reserved · Terms & Conditions · Terms of Use