FUTERA FUSION XLF Series INFINITE ENERGY2 Series FUTERA XLF Series FUTERA FUSION Series FUTERA III Series FUTERA II Series DOMINATOR Series LCD DOMINATOR Series 8800 Series 8900 Series SPECTRUM Series HeatNet Controls Pool Heaters Storage Tanks Combustion Air System
Case Histories Upcoming Events News
 




RSS News Feed for RBI Water Heaters RBI Water Heaters News

10/16/2012    Boiler Group Newsletter October 2012

 

 
A Mestek Newsletter
October 2012
boiler group header
 
Greetings!
The temperature is dropping and heating season is upon us. With the expansion of Hydrotherm's KN product line and RBI's new Futera Fusion XLF, we've got some great new products.  Talented new leadership on the engineering side of the business is bringing increased momentum to our R & D efforts.  Let's get busy and make this a super successful fourth quarter!
 
Sincerely,
 
Distributor Products Group
Marketing Team
 

 

6/18/2012    Expanded Technical Service Classes Now Available

 

Technical Service Classes  

Now Available 

 

We are pleased to announce that we have expanded the 2012 Technical Service Seminar schedule to include three additional classes.   

 

As many of you know, our first six classes scheduled for 2012 were completely booked with days of being announced.  Class size is limited and is available on a first come, first served basis. These classes fill up fast so please do not delay registering!    

 

The following classes have been added to our 2012 Technical Service Seminar schedule:

  

July 31  

August 24

September 6

 

 

To register, visit us online at www.MestekInstitute.com.  For more information, contact Janine Pedro at             (413) 564-5779      

 

Please Click For Complete News Release 

 

 

6/12/2012    Condensing in Cast Iron is Recognized in 2012 ASHRAE HVAC Systems and Equipment Handbook

 

Exciting News!

Condensing in Cast Iron is Recognized

in 2012 ASHRAE HVAC Systems and Equipment Handbook

 

The 2012 edition of the ASHRAE HVAC Systems and Equipment Handbook is out. The chapter on condensing boilers we were waiting for is officially out. It reads as follows:

Please Click For Complete News Release 

6/12/2012    RBI Introduces the Fusion XLF

Fusion_XLF__Announcement.pdf

 

RBI Introduces their latest innovative high efficiency hydronic heating offering, the Fusion XLF.The new XLF brings you premium efficiencies of up to 99% with capacities of up to 4000 MBH- all in one compact footprint. 

Please Click For Complete News Release 

2/6/2012    CMX CIPHEX

 

Come visit us at CMX – CIPHEX 2012

Metro Toronto Convention Centre

Toronto, Ontario

Booth #2530 & 2532

3/22 – 10:00am-6:00pm

3/23 – 10:00am-6:00pm

3/24 – 10:00am-3:00pm

3/31/2011    Mestek Boilers at ASHRAE 2011

George Carney introduces Ken Cohen and Sabino Piccirilli to discuss the KN-30 condensing boiler and HeatNet controls at the 2011 ASHRAE show in Las Vegas, Nevada

7/8/2010    HeatNet control

HeatNet.pdf

HeatNet, RBI’s proprietary integrated boiler management system is the driving force behind RBI’s energy optimization philosophy for its high efficiency equipment and is standard equipment on all Fusion and Futera (XLF & III) Air-Fuel coupled products.  Designed for precise system control, Heat Net provides repeatability and feedback thru digital communication.  The control monitors boiler temperatures and limit circuit inputs, maintains system and domestic hot water requirements, supports boiler room components including system/domestic pump, boiler pump, combustion air damper and modulates boiler firing rate to maximize turndown ratios in order to maintain peak efficiency.   (Click on pdf for additional information)

5/31/2010    RBI Facility Recognized For ISO 9001:2008 Certification

Certificate-En-_13348.pdf

RBI Facility Recognized
 
Congratulations to RBI Management and employees of our RBI manufacturing facility for their recent ISO 9001-2008 certification.  ISO is an international organization that provides standards for quality in business. The ISO 9001:2008 standard provides a tried and tested framework for taking a systematic approach to managing the organization's processes so that it consistently turns out product that satisfies customers' expectations.  We are proud of our employees for going the extra mile and recognizing the importance of satisfied customers!

3/24/2009    Come visit the Mestek Boiler Group at the Go Green Expo April 17-19, 2009 New York City Hilton

Stop by and visit the Mestek Boiler Group in booth #210 at the Go Green Expo in the New York City Hilton.  For more information and hours please visit www.gogreenexpo.com

3/12/2008    New Futera Fusion Boilers Are IBR Rated And Up To 97.5% Efficient

WESTFIELD, Mass. October 30, 2006 -- RBI has introduced the next generation of high efficiency commercial boilers and hot water heaters with the Futera Fusion™, a boiler that is IBR-listed and up to 97.5% efficient. The new boiler is designed to meet the changing demands of environmentally sensitive or green building design.
The gas fired condensing boiler with full modulation and a 3:1 turndown, is available in sizes from 500 to 2000 MBH. The Futera Fusion features advanced heat exchanger technology with solid bronze headers, a gasket-less heat exchanger and finned copper or cupronickel tubing for superb heat transfer. A metal-fiber burner allows seamless modulating turndown, ultra-low emission levels and whisper-quiet operation. In addition, the system automatically adjusts energy input to precisely match the heating load without over-firing or wasting fuel. In addition every model has a minimum full input efficiency rating of 94.5% with certain sizes achieving a rating of 97.5%. At minimum inputs, each model is capable of producing efficiencies as high as 99%.
A secondary solid stainless steel heat exchanger with condensate trap operates at the boiler’s full-flow rate and allows operation in condensing mode at all times. A state-of-the-art temperature mixing system protects the system’s primary heat exchanger.
The Futera Fusion is available as a fully packaged unit, including integral boiler pump, near boiler piping, low temperature mixing value and secondary heat exchanger. In addition, the new boiler comes with a full, 21 year, non-prorated warranty against damage from thermal shock. Its compact footprint of just 29-inches wide enables the unit to fit though standard doors, and its low maintenance design makes the boiler ideal for commercial, institutional and industrial applications.
For additional information visit RBIWaterHeaters.com or call Tim Markel, national sales manager at (413) 568-9571.

3/12/2008    Futera II Series Boilers Now Available With Stainless Steel Jacket

WESTFIELD, Mass., August 2004 -- RBI now provides high efficiency Futera II Series boilers with an optional stainless steel jacket. The brushed stainless steel jacket provides corrosion resistance for indoor or outdoor installations in harsh environments such as coastal areas and processing applications requiring wash down.

Futera II Series boilers, featuring non-condensing design, provide up to 85% efficiency with industry leading NOx levels of less than 10 ppm. The boiler features an advanced troubleshooting and self-diagnostic control that provides step-by-step cycle of operation. Each step is automatically tested and indicated, allowing for simplified and less costly troubleshooting.

Quality components include a rugged heat exchanger with bronze headers and fittings that prevent rust and corrosion for the life of the boiler. Finned tubes are industrial-grade copper with fins and tube walls formed as one for maximum heat transfer.

The compact, low maintenance design and venting flexibility of Futera II Series boilers permit easy installation and service. Seven models are available ranging from 500 to 1950 MBH. Futera II Series boilers are ideal for any domestic hot water or hydronic space heating application.

RBI, a Mestek Company, manufactures a full line of finned copper tube hot water heaters and boilers. For more information about the new Futera II Series boilers with optional stainless steel jacket, contact:

Tim Markel
RBI
260 North Elm Street
Westfield, MA 01085
Tel. (413) 568-9571
in Canada, (905) 670-5782
or visit www.rbiwaterheaters.com.

3/12/2008    New Manufacturing And Distribution Center In Canada

MestekCanadaRel.pdf

Mestek, Inc., a major U.S. holding company with more than 30 HVAC and metal forming companies in its structure, has a new manufacturing and distribution center in Canada.

The company’s new location on Tranmere Drive in Mississauga, Ontario, is 94,000 square feet, more than twice as large as its previous Canadian facility, and combines both manufacturing and distribution operations for the company in Canada. The company employs approximately 80 people at this facility.

Read the attached .pdf document for more information.

5/22/2006    Mestek, Inc. Gets New Home In Canada - New space for manufacturing and distribution


Westfield, Mass., May 4 - Mestek, Inc., a major U.S. holding company with more than 30 HVAC and metal forming companies in its structure, has a new manufacturing and distribution center in Canada.

The company's new location on Tranmere Drive in Mississauga, Ontario, is 94,000 square feet, more than twice as large as its previous Canadian facility, and combines both manufacturing and distribution operations for the company in Canada.

The company employs approximately 80 people at this facility. "We are thrilled to move into such a practical and modern facility," said Manny DaSilva, operations manager at Mestek Canada. "It is an exciting step in our overall growth, and provides us with a more efficient manufacturing facility, state-of-the-art laboratory and improved distribution."

On the manufacturing side, the new facility will produce commercial copper fin water heaters and boilers under the RBI name. In addition, inventory and distribute a wide variety ofMestek's commercial and residential heating and air-conditioning products in Canada, including:


  • Smith Cast Iron Boilers - Commercial and residential boilers.

  • HydroTherm - Commercial cast iron boilers and control systems..

  • Beacon/Morris - Hydronic, gas fired unit heaters.

  • Sterling HV AC Products - Engineered gas-fired make-up air units.

  • SpacePak - High velocity (mini duct) residential air-conditioning systems.

  • Heatrim American - Hydronic baseboard radiation.



Mestek products are shipped from the facility's five-bay shipping dock, and raw materials are delivered through two drive-in shipping and receiving bays. In addition to the RBI manufacturing operations, the facility is designed to provide in-depth product training and includes a presentation classroom for Mestek contractors, installers and customers, along with a 1,500 square foot hands-on, training laboratory.

For additional information about RBI or any of the Mestek products sold in Canada, please contact Mike Andersen at (403) 208-9844; for company products sold in the U.S., please contact Tim Markel at (413) 568-9571. Mestek information is also available on line at www.mestek.com.

3/5/2005    Spectrum Series Boilers Now Available With Stainless Steel Jacket

WESTFIELD, Mass., March 05 -- RBI now provides Spectrum Series boilers with an optional stainless steel jacket. The brushed stainless steel jacket provides corrosion resistance for indoor or outdoor installations in harsh environments such as coastal areas and processing applications requiring wash down.

Spectrum Series residential and light commercial gas boilers, water heaters and pool heaters allow for both indoor and outdoor, gas-fired application. The boiler features a reversible, two or four pass heat exchanger made from commercial grade 7/8” I.D. finned copper tubes. The fins are extruded from the tubing itself to ensure maximum heat transfer efficiency.

Spectrum Series units, from 100 – 400 MBH, are available with either cast iron headers for heating applications or with bronze headers for domestic hot water and pool heating applications. All units have a built-in draft hood which reduces the cost of installation and lowers the overall height of the unit. A self-diagnostic light package allows for fast easy assessment of boiler performance.

RBI, a Mestek Company, manufactures a full line of finned copper tube hot water heaters and boilers. For more information about the new Spectrum Series boilers, water heaters and pool heaters with optional stainless steel jacket, contact:

Tim Markel
RBI
260 North Elm Street
Westfield, MA 01085
Tel. (413) 568-9571
In Canada, (905) 670-5888

2/15/2005    New Futera III Series Boiler Brochure Highlights Full Modulation Performance Benefits

WESTFIELD, Mass., Feb. 2005 -- RBI has produced a new, six-page brochure featuring the Futera III Series, full modulation boilers and water heaters with 3:1 turndown. The full color publication provides photos and information detailing the product’s performance characteristics, installation flexibility and easy to service features.

The brochure features color illustrations detailing the design and construction of the Futera III’s rugged, gasketless heat exchanger with bronze headers and fittings. Advanced control technology is also detailed with color photos and information. Detailed graphs including “Blocked Flue, “Blocked Air Inlet’, and gas pressure in H20, highlight the performance features of the Futera III in real-world conditions. Comprehensive specification charts and dimensional drawings are shown for accurate specifying and size selection of models ranging from 500 – 2000 MBH.

RBI, a Mestek Company, manufactures a full line of finned copper tube hot water heaters and boilers. For more information or a free copy of this brochure contact RBI at (413) 568-9571 or visit www.rbiwaterheaters.com.

Archived Articles
Mestek: Experience based innovation
Bookmark and Share
A Mestek Company       Copyright © 2004- Mestek Technology, All Rights Reserved · Terms & Conditions · Terms of Use